bridges and bypasses
Phoenix Engineering and Research Ltd.
The world Bank @ Ministry of public Works Monroviav, Liberia
CICO - China Chongqing International Construction Corporation Ltd.

About the project

A sectional bridge in Monrovia, the capital of Liberia, which was designed using the balanced girder method over the “Masordo” river, which is about 200 m wide. The planning was done for the World Bank and the Government of Liberia.
It is about 240 m long, its central opening is 100 m and its area is about 3,150 square meters. The bridge included the construction of central abutments in deep water, one using an artificial island and the other using sluice walls and water pumping.
The project is characterized by the logistical complexity of transporting the concrete over the river, both for the construction of the commissioners and for the construction of the drive. For this purpose, a concrete plant and a complex set of pumps were established.