bridges and bypasses
Ashtrom
Moriah – Netivei Israel – National Transport Infrastructure Company

About the project

The Ashdod South Interchange comprises four road bridges having a total area of approximately 15,000 sqm. Different methods were used for construction of the bridges, such as beam bridges in a trench cross section and in a section I (AASHTO Specifications) prestressed and post-tensioned method. This project also included a large number of road structures including retaining walls, signage gantries, high-mast light poles, and various drainage structures.