A pair of road bridges cast-in-situ over formwork with a single aperture of 62 meters each. The bridge carriageway was planned to employ post-tensioned box sections at widths varying from 14.5 to 12.5 meters. At a total area of 1,700 m2, the bridges’ static height is 2.9 meters.
The project included an underpass, animal crossing, deep foundations, retaining walls, and anchored slurry walls.
Bridges & Interchanges
E. Spivak
Nati
Ton Ltd.