A cut & cover railway tunnel for a 1 km double arch-section. Tunnel excavation technology employed cyclic casting using advanced mold. The project incorporated retaining walls with soil nails going up 25 meters, for temporary support of an area totaling 10,000 m2.
Tunnels,Underground Structures
E. Spivak Ltd.
Shafir Engineering
Shafir Engineering