A bridge over the Woji River in Nigeria’s Port Harcourt delta, covering an area of 4,000 m2 in total. The bridge was constructed using prefab AASHTO-section beams and cast-in-situ carriageway slab. It is approximately 210 meters long, with a maximum aperture of 32 meters. As the bridge was constructed in a marine environment, the beams were assembled using a barge which carried the cranes and beams. The bridge abutments were placed on retorted precast concrete pile foundations.