Tel Aviv Jerusalem , rapid railway line segment B tunnel no.1 "Aked"

Structure Type: TBM tunnel
Client: JV Minrav Mosmetrostoy

Design manager and prime coordinator by the contractor for the construction of dual tunnels measuring 3.5km long made by the T.B.M method, and connection tunnels lay down between them every 250m by the N.A.T.M Method. The design works also include temporary and final portals, C&C tunnel sections, a precast manufacturing plant, structural design for the implementation stage and more.