Tel Aviv - Hahagana Bridge

Client: Israel National Road Company
Design of 130m bridge with precast girders, by the combination of pretension and post tension methods to pre-stress the girders and allow a continuing beam scheme.
Due to the fact that the location of one of the piers is adjacent to the "AyalonRiver" it was required to use "JET GROUTING" method for strengthening the ground. The first time this method was used in Israel.