Netivot Yad Mordechai railway track

Client: Elyakim Ben Ari
Various retaining walls are designed and constructed along the railway track at a total area of 30,000m2. The walls support the track ramp, nature reserves, and places where the work boundary and the city-building plan are closely packed. The designed walls are diversified, including walls made of reinforced concrete, sheet pile walls, and slurry walls with pre-tensioned anchors for a 50-ton capacity at the height of up to 20m